SCRCA Glossary Term: Construction / installation period

Submitted by mark.harvey /
SCRCA Glossary Term
Construction / installation period
SCRCA Glossary Definition (Short version)

The period during which the site or structure was constructed, installed or created. The classifications used for the SCRCA Project are:

  • 0: Unknown = The date / period of construction, installation or creation has not yet been ascertained.
  • 1: Pre-69 = Prior to construction work commencing on the Settle-Carlisle line (prior to 1869)..
  • 2: MR-C = Midland Railway construction phase (1869 to 31st December 1876).
  • 3: MR-O = Midland Railway operational phase (1st January 1877 to 31st December 1922).
  • 4: LMSR = London Midland Scottish Railway operational phase (1st January 1923 to 31st December 1947).
  • 5: BR = British Railways operational phase (1st January 1948 to 31st December 1964) and British Rail operational phase (1st January 1965 to 31st March 1993).
  • 6: Post-BR = After British Rail - includes Railtrack and Network Rail operational phases (1st April 1994 to present).

Section menu for glossary entries