Blea Moor Tunnel Air Shaft 1 and Winch Foundations: Context from south
Image Type
Context view
Image Contributor
SCRCA Project Contributor: Mark R. Harvey
Image Date
Location Reference(s)
Image Notes
The concrete pad (left foreground) is the foundation slab for the winch that was used to lower and raise men, materials and equipment during construction of the tunnel. After the tunnel was completed, the access shaft was converted into a ventilation shaft.