Snippet Detail
During a twelve week project in late 2017, CAN Geotechnical Ltd undertook repair work to the drainage systems lining the two ventilation shafts associated with Rise Hill Tunnel (Air Shaft 1 and Air Shaft 2). A brief summary of the work is available at:
https://www.can.ltd.uk/casestudies/risehill-tunnel-shaft-works