Source: "The Midland railway: its rise and progress. A narrative of modern enterprise" by Frederick Smeeton Williams, published by Strahan & Co London (1876):

Soon after leaving Armathwaite we pass over one of the heaviest embankments on the line. It stretches from the station to a little beyond Drybeck viaduct, and contains nearly 400,000 cubic yards of material. As two and a half or three such yards of "stuff" would quite fill a tip waggon, it is plain that at least 133,000 separate journeys had to be taken, and 133,000 such loads had to be filled and emptied, before even this one work could be completed. This viaduct has seven arches, and is 80 feet high above the surface.